May 2, 2023 Mobilisation of offshore wind turbines
Together with members of IJPOS, we managed the mobilisation of offshore wind turbines to Windpark Fryslân.
Using 9 pontoons, we transported the 15-metre-tall transition pieces and other wind turbine parts to the desired location on the IJsselmeer, where they were assembled on-site.